9.2. Execution Cancellation

What if the code you execute in cluster takes longer than acceptable. If you cannot stop/cancel that task it will keep eating your resources. Standard Java executor framework solves this problem with by introducing cancel() api and 'encouraging' us to code and design for cancellations, which is highly ignored part of software development.

public class Fibonacci<Long> implements Callable<Long>, Serializable {
    int input = 0; 

    public Fibonacci() { 
    } 

    public Fibonacci(int input) { 
        this.input = input;
    } 

    public Long call() {
        return calculate (input);
    }

    private long calculate (int n) {
        if (Thread.currentThread().isInterrupted()) return 0;
        if (n <= 1) return n;
        else return calculate(n-1) + calculate(n-2);
    }
}

The callable class above calculates the fibonacci number for a given number. In the calculate method, we are checking to see if the current thread is interrupted so that code can be responsive to cancellations once the execution started. Following fib() method submits the Fibonacci calculation task for number 'n' and waits maximum 3 seconds for result. If the execution doesn't complete in 3 seconds, future.get() will throw TimeoutException and upon catching it we interruptibly cancel the execution for saving some CPU cycles.

long fib(int n) throws Exception {
    ExecutorService es = Hazelcast.getExecutorService();
    Future future = es.submit(new Fibonacci(n));  
    try {
        return future.get(3, TimeUnit.SECONDS);
    } catch (TimeoutException e) {
        future.cancel(true);            
    }
    return -1;
}

fib(20) will probably will take less than 3 seconds but fib(50) will take way longer. (This is not the example for writing better fibonacci calculation code but for showing how to cancel a running execution that takes too long.) future.cancel(false) can only cancel execution before it is running (executing) but future.cancel(true) can interrupt running executions if your code is able to handle the interruption. So if you are willing to be able to cancel already running task then your task has to be designed to handle interruption. If calculate (int n) method didn't have if (Thread.currentThread().isInterrupted()) line, then you wouldn't be able to cancel the execution after it started.